Belgium

Antwerpen Centraal

14 tracks (on completion in april 2007)

This station is now under reconstruction. Under the beatiful 19th century roof are 3 levels built which will contain 6 + 4 + 4 platforms (from top to bottum). The lowest trackts will emerge from a tunnel which is nuilt fot the HST to Amsterdam and new regional connections.

Brussel Zuid / Midi

Capicity is 23 tracks

This station is in reconstruction too. The picture left shows the new Eurostar Channel link terminal.The rest of the station will be improved in simular way.

Liege - Guillemins

Cap. 9 tracks

This station replaces the old '70's station. A spectacular building has been created by Santiago Calatrava!.